Filter/Preselection

Country
Status
Start
Construction volume (value of our services)
  • 3
  • 2
  • 5
  • 2
Set
Map view
Results: 13 Show all

Refresh of “TORO 1” commercial building, Brown Boveristrasse 5

Zürich, Switzerland

Start of construction: August 2019

Construction volume (value of our services): 20 Mio. CHF

The current main tenants have reduced their rental space. The vacant rental area measuring around 8,900 m², about 45% of the total rental area, is to be made available for rental to various users (multi-tenant) in future.

[Translate to English:] Quai Zürich

Quai Zurich

Zurich, Switzerland

Start of construction: April 2017

The Quai Zurich project involves the redevelopment of the global headquarters of the Zurich Insurance Group. Bringing together heritage properties full of tradition and state-of-the-art construction, the project reflects the evolving nature of our company.

[Translate to English:] Vogelsang 3D Design

Vogelsang

Wetzikon, Switzerland

Start of construction: March 2016

Construction volume (value of our services): 8,2 Mio. CHF

The "Vogelsang" housing estate is situated in Wetzikon-Kempten, nestled between forests and farming land. The existing buildings are being modernised in several stages, with new construction also taking place in some parts. In total, 146 renovated rental apartments are available for prospective tenants.

Affolternstrasse 77+79, 8050 Zurich

Zurich, Switzerland

Start of construction: January 2019

Construction volume (value of our services): 5 Mio. CHF

Renovation and addition of another floor to the residential buildings Affolternstrasse 77/79, 8050 Zurich. The existing 31 apartments were supplemented with an additional 4 apartments with a wooden extension. The tenants could remain in the apartments during the renovation.

Renovation Überlandstrasse 375/377 und 391/393

Zürich, Switzerland

Start of construction: August 2017

Construction volume (value of our services): 20 Mio. CHF

The two apartment buildings from the 1960s with a total of 180 apartments are in great need of renovation and refurbishment.

Haus Adeline Favre (Hall 52)

Winterthur, Switzerland

Start of construction: December 2016

Construction volume (value of our services): 69 Mio. CHF

In 2017, Siska Heuberger Holding AG acquired Hall 52 from Implenia Schweiz AG as the owner and developer in the Lokstadt district and, at the same time, commissioned Implenia with the turnkey contractor mandate for the new construction of replacement property.

Zentralstrasse 37– Town Town

Zürich, Switzerland

Start of construction: August 2015

Construction volume (value of our services): 18 Mio. CHF

The 1970s office building has undergone total renovation and conversion creating a residential building with 35 flats, 3 studio flats and 4 commercial units on the ground floor.

Allenmoosstrasse

Allenmoosstrasse 116-120

Zurich, Switzerland

Start of construction:

Construction volume (value of our services): 21 Mio. CHF

Complete renovation of eight multi-occupancy homes and building extension